It Will Get Done!

I know that it has seems like we forget about projects that we have started but that is not 100% true.  Last night Allyssia, Roland and I picked up where we left off on the mud room.  With a final coat of paint on the ceiling we were able to put down the floor we have had sitting around for a few weeks.

We will still have some spot painting left to do on the logs but the main walls and ceiling are done.  The floor is also checked off the list. 




We ran the flooring as you can see the length of the room starting on the outside wall.  The first row I ran just the single then after that I ran two at once.  We picked out the lighter colored flooring so it would not show the sand and dirt as bad. 




The flooring is a pvc based flooring that is 100% waterproof and to top it off super easy to install.  We have the same brand of flooring in the kitchen and it has held up superbly. 



Around the log edge I an running some brown pvc quarter round.  It covers up the gap and holds that end of the flooring down for now.  Around the other walls I will have some four inch mop board. 
Next step is going to be the wainscotting up to the bottom of the windows, then the crown molding around the ceiling and lastly will be cubbies, coat hangers and a little bench



We are moving along with the room slowly but surely.  We probably wont move onto the paneling and mop board until after Christmas but we will get it done eventually!
Until next time stay tuned and check back often. 