Thursday, January 17, 2019

Just the Hitch Left

Work has been keeping me busy lately and to be quite honest I have barely done a thing except for keep the wood stove burning.  My problem lately has been that my shop takes a while to warm up and by the time I get home from work it would be a waste of oil to try to heat my shop up for the few minutes I would be out there.  This past week we did have one nice day that I made it into the shop with multiple layers on and attempted to finish a project.  As I said before this project has been in the process for around five years and I am finally finding time and a reason to finish it.
This is going to be the Galloway trailer when it is finished.  The trailer is two lawn mower front axles welded to some two inch box tubing.  The rear axle is welded straight while the front steers like a hay trailer.

I went the sturdier and more adjustable route with the steering and used Ball joints on the steering rods rather than just a solid rod like the original lawn mower had.  When I started this project I was able to pick the frame up to move and store it but now with the wet hemlock boarding and the extra hardware it is to be wheeled around only!




Saturday I plan to finish the hitch and mount the Galloway onto the cart.  I would love to stay caught up on my blogs a little bit better but with my work schedule I fall behind.  To make up for this I am going to start posting little sneak peak previews on my Facebook page and doing multiple blog posts over the weekend when I am not working.  So until next time stay tuned and as always check back often for more fun. 


Tuesday, January 8, 2019

A Slow Start to the New Year

The new year has come and I have had this thing called work keeping me from all of the fun projects.  We have been exceptionally busy with work and the snow/rain combination we continue to get.  So just a quick update for the today.  Tomorrow night after I finish snow removal I am bringing my truck to Merril's garage to have the ball joints done and get a new inspection sticker.  Other than that I have been splitting and hauling in firewood and I have decided that I could not do without my Supersplit. 
Lastly for today I received a manual for one of my antique engines!  I found the manual on one of the engine groups I am part of and bought it as soon as I could.  I will post pictures of the engine as soon as I can.  The engine I have is kind of special where it has a pulley on the side that has a clutch mechanism built into it.  Anyways more on that in a later post.  Until next time stay tuned and leave me a comment!

Tuesday, January 1, 2019

A New Year

The new year is going to be a time of old projects mixed with new projects.  This year is going to be an exciting mix of tractors, engines, family, and our farm!  In the past year there have many projects come and go and another good many that have come and are still inching along ever so slowly.  Now I do intend to finish all my projects but like the Oliver project I can not promise them all in a timely manner.  Speaking about the Oliver project, the crawler is still coming along ever so slowly.  For the past few weeks I have had the Carburetor soaking in a cleaner.  I bought the cleaner at Motor Supply because of the recommendation of one of the counter guys. 
After leaving the carburetor soaking for almost two weeks I blew it out with the air compressor and re-assembled it.  As the first time using the cleaner I was leery but I will tell you that every time I tear a tractor apart and need to clean the Carburetor it will be taking a nice bath in this can of cleaner.  It left the Carburetor looking clean inside and out.  There was no grime of flakes of rust anywhere.  After using it I can say nothing but good about it. 




The can even comes with a nice little basket that nestles into the bottom to hold any small part.
  Enough about the cleaner in a can and back to the Oliver itself.  After re-assembly and new spark plugs and wires I finally have it so it can be started and will idle.  At this point it still is not at 100% but it is running none the less. 

We are only a short ways away now from pushing snow, the manure pile, and lifting engines with the Oliver!
As we all know I never have a single project going at once.  This is my latest project: a miniature hay wagon to mount the Galloway on.



I started this project when I still lived at my parents and decided that it would be perfect for the Galloway or any other engine.  The two risers will be coming off and it will be planked.  There is still a bit of welding to be done but this should be a quick project.   A quick project like that has to be quickly succeed with the start of a long project!



This is a Model A truck frame set up as a trailer.  My plan for this is to build a deck on it and turn it into a mobile hit and miss powered ice cream maker.  It is hard to imagine looking at the frame but it will be a work in progress.  That will be all for today but until next time stay tuned and leave a comment. 

Monday, December 31, 2018

Clattering into the New Year

As we come into the new year I am not one to make a hundred resolutions or even finish projects before the new year.  If anything I get less done at the end of the year with the holiday season than I usually do.  With that being said I have put off blogging just a little with the holidays and work being so busy so you are in for a long read and a bunch of pictures. 
     To start off on a year ending beat I did get the furnace and oil tank completely hooked up in the shop. 
I got the nice stand for the oil barrel from work and the barrel I got from my brother.  Since I am mainly burning oil I get from work I cut a hole in the top of my barrel and using a five gallon bucket made a screen of sorts to keep the larger debris out of my oil barrel.  I did install an in line filter on the furnace but the cleaner the oil the better. 




On Christmas weekend it warmed up and rained so we subsequently had a flood in our lower field.  The rain alone did not cause the flood but the stream was iced over and the excess water caused the ice to break up and jam.  This water is over 200 yards further into the field than it normally is. 



 The ice was so big Cricket, Emily and I were able To have a photo shoot standing on one of the "icebergs" that had come inland before the water went back down.
 
The ice that was jammed was about eight inches thick and there were some huge pieces left behind.  There were a few at almost 100 yards ashore that measured at least six foot by six foot. It was strange to see our usual slow moving shallow stream raised up around seven feet and moving chunks of ice downstream at record speed. 
             Another project that I have started in this year that I definitely plan on carrying into the new year is not so much a project but an interesting change of scenery.  This past Sunday I got to haul logs again.  I am driving for Hillside Excavating On the Paper mill property.



For now we are just hauling softwood from one of the mill's wood yards on the property down to where they feed the wood into the mill.  It is by no means a long haul but it is fun and a change of pace.  For this post I am going to call it good and have another one ready for your viewing tomorrow. Here at Rusty Gold Farm we wish you all an amazing new year!!!

Monday, December 17, 2018

Christmas Time is Here

With Thanksgiving gone by Allyssia decided we had to have a Christmas tree and all of the decorations.  Now we did not get a perfectly manicured tree from a tree farm but we did get a big tree.  Being one of the last trees off from the Oullette tree farm and topping out at eight feet tall I give you this years Christmas tree. 
Luckily we have Cathedral ceilings!  My favorite part of Christmas decorating is the Christmas village.  Last year was only our second Christmas so we didn't have many houses or village items.  Well over the summer and when the villages are on clearance we bought quite a few pieces.  What we found out when we took it all out is that we needed more room to put all of the village.  Allyssia found the idea of using an old ladder with boards across the rungs for the village but alas I couldn't find one that would work.  So with some of my hidden 2x4's and pine boards I built a Christmas ladder. 
Allyssia is already planning on expansion so next year I will have to build another one to fit all of our villages on!  Until next time stay tuned and check back often. 

Introducing (sir) Galloway

As I slowly continue working in my shop I have come to the realization that I have not introduced you to the newest "member" of Rusty Gold Farm.  As usual this new member showed up needing work and not running and so far we haven't come very far.  Rolling in at a whopping 5 horse power I am glad to show you the Galloway engine!




The Galloway needs some care and fixing up but on the bright side it has an original Webster Magneto and a reproduction brass carburetor.  Now the carburetor was something that was custom made that Grampa bought for the engine.  The Galloway is complete and there will be updates soon as I make progress as well as more progress on the Oliver soon and a whole slew of new projects.  Until next time stay tuned and leave me a comment. 

Thursday, December 6, 2018

Closing in the Front Porch

Home ownership I have found is just one long project that never ends.  On today's segment of the never ending fun I am finishing off my front porch/mud room.  The previous owner framed the porch up and had the windows framed out but, no windows.  When Allyssia and I bought the house I had high hopes of getting the porch closed up quickly and I went out and bought windows.

For the six months after the porch looked just like this, with the windows leaning against the wall inside the porch.  Since it is getting colder and I am remembering how much of a mess 2 dogs and 2 humans with barn boots make, I decided to get my rear in gear and put the windows in and finish that mud room!  Now I have never installed windows before but it was surprisingly easy as long as I had shims and followed the directions.
I am rather proud of myself because I don't think of myself as a great carpenter but I think that these windows came out really well!  Next step is putting the last board around the bottom of the wall and then on to the inside.
The next step (which took until winter) was to put the last board on the bottom of the wall and insulate the room. 

Using Roxul and lots and lots of spray foam - the mud room is finally all sealed up.  I still have to put a ceiling in the room and insulate the floor but I laid plywood on the floor for a sub floor and that sealed up all the cracks and gaps until spring.  This weekend I plan on framing the ceiling up but I am on call so I can guarantee nothing.  Stay tuned as we finish this room off, add heat, and make it into the nicest little mud room possible